Full-Time Senior Electrical Estimator - Data Center Construction

Turner & Townsend is hiring a remote Full-Time Senior Electrical Estimator - Data Center Construction. The career level for this job opening is Experienced and is accepting New York, New York based applicants remotely. Read complete job description before applying.

Turner & Townsend

Job Title

Senior Electrical Estimator - Data Center Construction

Posted

Career Level

Full-Time

Career Level

Experienced

Locations Accepted

New York, New York

Salary

YEAR $135000 - $165000

Job Details

Turner & Townsend is seeking a highly skilled Senior Electrical Estimator to support large-scale, high-value data center construction projects. This role is ideal for professionals with deep experience in electrical estimating and a strong understanding of the complexities involved in hyperscale data center builds. You’ll be part of our Construction Management team, delivering expert cost consulting services and working closely with clients, general contractors, and project teams throughout all phases of construction.

Responsibilities:
  • Lead electrical estimating efforts from RFP through construction completion for hyperscale data center projects.
  • Develop and present detailed cost plans at conceptual, programming, and design stages.
  • Conduct feasibility studies and contribute to procurement strategy and reporting.
  • Manage all aspects of procurement: pre-qualification, bid analysis, bid reporting, and contract documentation.
  • Review and validate subcontractor bids and scopes for completeness and accuracy.
  • Perform cost checks, valuations, and change control processes on large-scale projects.
  • Produce monthly post-contract cost reports and present findings to clients.
  • Provide input into value engineering and negotiate final accounts.
  • Collaborate with project managers and design teams to align scope, budget, and schedule.
  • Analyze historical cost data and market trends to support benchmarking and forecasting.
  • Participate in risk assessments and mitigation planning related to electrical systems.
  • Maintain strong client relationships and act as a trusted advisor throughout all project phases.
  • Mentor junior team members and contribute to internal process improvements.
  • Support the development of estimating tools, templates, and best practices tailored to data center projects.
  • Coordinate with design and engineering teams to ensure constructability and cost efficiency.
  • Monitor market conditions and supply chain trends affecting electrical systems and materials.
  • Ensure compliance with local codes, standards, and permitting requirements.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Requirements:
  • Degree in Engineering, Construction Management (with technical focus), Quantity Surveying, or a related field.
  • Minimum of 7 years of experience in electrical estimating and cost consulting.
  • Proven ability to prepare large, complex electrical cost estimates.
  • Experience in data center construction estimating or related is preferred.
  • Hands-on construction experience with electrical systems is required.
  • Experience working with electrical subcontractors, demonstrating deep understanding of scopes, means and methods.
  • Strong technical expertise across all cost management phases: pre-contract, post-contract, and final account.
  • Excellent communication, presentation, and interpersonal skills in client-facing environments.
  • Proficiency in Microsoft Office, AutoCAD, Navisworks, Bluebeam, and other relevant software.
  • Familiarity with estimating platforms such as CostX, WinEst, or similar tools.
  • Strong organizational skills and ability to manage multiple priorities in a fast-paced environment.
  • Deep knowledge of construction procurement methods and contract structures.
  • Experience advising clients on value management, value engineering, and life cycle costing.
  • Understanding of electrical systems in mission-critical environments, including redundancy, power distribution, and commissioning.
  • Business development experience and ability to identify growth opportunities.

FAQs

What is the last date for applying to the job?

The deadline to apply for Full-Time Senior Electrical Estimator - Data Center Construction at Turner & Townsend is 14th of December 2025 . We consider jobs older than one month to have expired.

Which countries are accepted for this remote job?

This job accepts [ New York, New York ] applicants. .

Related Jobs You May Like

Senior Verification Engineer

Centennial, CO
1 day ago
Digital Test Plan
Simulation
System Verilog
SEAKR Engineering
Full-Time
Experienced
YEAR $130000 - $165000

Water Treatment Equipment Troubleshooting Specialist

Pickering, Canada
1 day ago
Client Relationship Management
Customer Support
PLC Controls
Veolia Environnement SA
Full-Time
Experienced

Field Service Engineer

Toledo - Ohio, OH
2 days ago
Calibration
Customer Satisfaction
Maintenance
Anton Paar
Full-Time
Experienced

Supplier Quality Engineer

Irvine, CA
2 days ago
Data Analysis
Electrical Engineering
Problem-solving
Western Digital
Full-Time
Experienced

Senior Power Engineer

Charlotte, NC
3 days ago
DC Power Systems
Engineering Documentation
Industry Standards Compliance
Brightspeed
Full-Time
Experienced

PCB Designer Semiconductor

Böblingen, Germany
1 week ago
BOM Management
Hardware Design
PCB Layout And Design
ALTEN
Full-Time
Experienced

Senior Engineer Component Introduction

Regensburg, Germany
1 week ago
APQP/PPAP/VDA6.3/IATF16949
Failure Analysis
Semiconductor Design
Aumovio
Full-Time
Experienced

Traveling Journeyman Electrician

Farmer City, IL
1 week ago
Electrical Codes
Electrical Schematics
Electrical Systems Installation
Knobelsdorff Enterprises
Full-Time
Experienced
HOUR $45 - $55

Sales Engineer - Industrial, Electrical Connectors

Chennai, India
1 week ago
Business Development
CRM
Electrical Connectors
Stäubli
Full-Time
Experienced

Field Engineer

Vilnius, Lithuania
1 week ago
Crane Hydraulics
Electrical Maintenance
PLC Programming
Konecranes
Full-Time
Experienced

Protection & Controls Field Technician

Houston, TX
1 week ago
Electrical Drawings Interpretation
High-Voltage Electrical Systems Testing
NETA, IEEE, NFPA Standards Compliance
VTekis Consulting LLP
Full-Time
Experienced

Supervisor de Serviços (HVAC) - SP

São Jose dos Campos, Brazil
1 week ago
HVAC Systems
O&M Contracts
Preventive Maintenance
Bosch-HomeComfort
Full-Time
Manager

Looking for a specific job?